Leave a Message

Thank you for your message. We will be in touch with you shortly.

Explore Our Properties
Background Image

Cedar Park's New Weekend Spots Opened Fast. The Trails Connecting Them Didn't.

September 10, 2026

Three new places to spend a Saturday opened in Cedar Park in the space of about five months this year. A mini golf and dining venue on C-Bar Ranch Trail. A ropes course and event pavilion at the YMCA on Little Elm Trail. A sporting goods flagship that just cut its ribbon at the end of August. On paper, all three sit within a few minutes of each other and of Lakeline Park, the city's largest green space.

What hasn't caught up is the connective tissue between them. The pedestrian bridge designed to link Lakeline Park to the YMCA campus and the regional trail system now has a completion date of early 2028. The park's next phase of trails is still in the design phase, with construction not starting until next summer. And the one trail segment that's already finished has had a detour running through it since spring.

If you've been keeping a mental map of what's new around town, it's worth updating with a second layer: what's open, and what's still years from being walkable to.

Three Ribbon-Cuttings in Five Months

PopStroke opened its Cedar Park location on April 21 at 817 C-Bar Ranch Trail, a day after Mayor Jim Penniman-Morin and PopStroke founder and CEO Greg Bartoli cut the ribbon together. The venue has two 18-hole mini golf courses with on-course food and drink ordering through an app, a full-service restaurant and bar called BarTenders, an ice cream parlor, a playground, and yard games like cornhole. It's the company's second Austin-area venue, following its first location, which opened in September 2025.

Two months later, the YMCA's Twin Lakes campus opened the Orr Family Sky Trail and Avery Family Pavilion to the public on June 13, following a ribbon-cutting ceremony the day before. The Sky Trail is a two-tiered ropes and climbing course with zip lines and elevated walkways, built with a lower Sky Tykes area for younger kids and an upper course for teens and adults. Tickets run $28.99 for the main course. The neighboring Avery Family Pavilion is an 8,000-square-foot event space with garage-door-style windows and a deck overlooking the lake, built for everything from birthday parties to weddings. One of the project's donors, Jim Orr, said at the opening:

"We believe the memories made on the Orr Family Adventure Course will shape lives forever."

The expansion cost close to $12 million, split between Williamson County bond funding and private donors, which is part of why it moved from groundbreaking in May 2025 to public opening in about thirteen months.

Then, on August 29, SCHEELS opened its Cedar Park store. The sporting goods retailer had already introduced itself to the community months earlier as presenting sponsor of the Parks & Trails Foundation of Cedar Park's Earth Day Celebration at Lakeline Park in April, an event that drew more than 1,500 attendees.

All three of these projects share something. They were built and funded outside the city's own capital projects budget, through private investment, YMCA fundraising, or corporate real estate decisions. That's a big part of why they arrived on a timeline measured in months instead of years.

The Bridge That's Supposed to Link Them Is Still Two Years Out

The piece of infrastructure that would actually tie Lakeline Park, the YMCA campus, and the Brushy Creek Regional Trail together on foot is a pedestrian bridge over Bell Boulevard. It's been part of the city's plan for years, shown as a connection point back in the original 2015 parks master plan. As of a filing with the Texas Department of Licensing and Regulation in May, the estimated construction cost sits at $9.7 million, and city staff told local reporters the total project budget, bridge and trail connection combined, is now closer to $13.4 million. The completion date has also moved. It was previously targeted for the end of 2027. It's now February 2028.

That's not a small slip. It means anyone hoping to walk or bike directly from Lakeline Park's north side, across Bell Boulevard, to the YMCA's Sky Trail or the Brushy Creek Regional Trail is looking at roughly another eighteen months of driving instead.

Lakeline Park's Bigger Vision Is Still on the Drafting Table

Lakeline Park itself is mid-transformation. Phase 1, which opened in March 2023, gave the city its playground, splash pad, four miles of paved trail, and the Great Lawn. Phase 2, approved by City Council on April 23 this year, is a much bigger swing: an elevated canopy walkway with lake overlooks, a disc golf course, a new south-side parking lot, additional restrooms, and an "interactive" kayak stop. The city signed a $2.1 million design and engineering contract with landscape architecture firm SWA Group on May 28 to turn that master plan into construction-ready drawings.

Landscape architect Scott McCready, who led the planning process, said the goal was making residents feel more connected to parts of the park most people never see. As he put it during the council presentation, the design tries to bring people into

"an enormous amount of acreage that people don't actually get much access to."

That's a good goal. It's also a couple of years away. Design work wraps in spring 2027, construction starts that summer, and the city is targeting a fall 2028 opening for Phase 2. Combined with the roughly $18 million already earmarked for the project in the city's FY 2027 budget, this is clearly happening. It's just not happening this fall, or next fall either.

Even the Trail That's Already Built Has a Detour

Here's the part that catches people off guard the most, because it involves infrastructure that already exists. The Brushy Creek North Fork Trail, a three-mile concrete path connecting Parmer Lane down to the Brushy Creek Regional Trail, finished construction in early 2025. It's a real trail, already open, already part of daily routines for a lot of Cedar Park residents who bike or walk it near Red Horn Coffee House and Brewing Company and The Peddler Bike Shop.

Since spring of this year, though, a detour has been in place at the Brushy Creek bridge itself, tied to the Toro Grande Roadway Improvements Project, which is building a new four-lane connector between New Hope Drive and Parmer Lane. The city's notice says the detour will stay in place through the end of 2026. So even the trail segment that's finished, funded, and open has a construction-related interruption running through the busiest months of the year for outdoor use.

What This Actually Means for Your Saturday

Put together, the picture for this fall looks less like "new trail network, go explore" and more like a set of destinations that are each worth the drive on their own, without much walkable connection between them yet.

A few things that are actually true right now:

  • PopStroke, the YMCA's Sky Trail, and SCHEELS are all open and operating on normal public hours, no waiting required.
  • Lakeline Park's existing four miles of Phase 1 trail, the playground, splash pad, and kayak rentals are unaffected by any of the Phase 2 planning and open as usual.
  • The Bell Boulevard pedestrian bridge that would let you walk between Lakeline Park and the YMCA campus won't exist until roughly February 2028.
  • The Brushy Creek North Fork Trail is open, but plan for a detour at the Brushy Creek bridge crossing through the end of this year.
  • Lakeline Park's canopy walkway, disc golf course, and expanded trails aren't breaking ground until summer 2027, with an opening targeted for fall 2028.

None of this means the neighborhood's outdoor life is standing still. If anything, the last five months show how much of it is being built by private and nonprofit investment moving faster than the public trail network that's supposed to stitch it together. That gap closes eventually. For this fall, the honest answer is: drive between the good stuff, and give the trails a couple more years to catch up.

If you're the kind of person who tracks these details because you're weighing whether Cedar Park fits how you actually want to spend a weekend, that's the kind of on-the-ground read our team keeps close. You can browse more on the Cedar Park neighborhood page, or reach out to Sage Space RE directly to schedule a neighborhood consultation.

Follow Us On Instagram